City of Tracy Aquatic Center

The City of Tracy’s Parks, Recreation, and Community Services Department’s vision is, “together, we create memorable experiences that link Tracy’s past, present, and future.”

Four children in pool, holding pool edge and kicking, smiling at camera

Home

Project Overview

The City of Tracy is building a new Aquatic Center for recreational and competitive use. The long-awaited Aquatic Center will be a community facility owned, operated, and programmed by the City of Tracy, offering recreational/competitive areas, swim lessons and more. The City Council ranked amenities in descending order of priority, as funding permits: 1) a 50-meter competition pool; 2) a recreation and warmup pool; 3) a lazy river; 4) water slides; 5) a toddler area; 6) an indoor pool (optional); and 7) a fitness center (optional).

smiling elder woman in outdoor pool facing into sunshine

Next Steps

The proposed timeline for the Aquatic Center is as follows. All dates are subject to change based on weather, equipment and material availability or other potential delays.

The timeline construction of the Tracy Aquatic Center includes the following steps: 1) Project Consultant Team Selection, Fall, 2024; 2) Program and Conceptual Design and Approval, Fall and Winter, 2024; 3) Community Outreach, Winter, 2025; 4) City Council Direction on Conceptual Design, Winter, 2025; 5) Schematic Design and Approval, Spring, 2025; 6) Design and Development, Summer, 2025; 7) Construction Documentation, Fall and Winter, 2025; 8) Plan Check and Permits, Winter through Summer, 2026; 9) Bidding and Award, Summer and Fall, 2026; 10) Construction, Fall, 2026, through Summer, 2028; 11) Grand Opening, Fall, 2028.

Project Location

The Aquatic Center will be built on the northwest corner of Summit Drive and Corral Hollow Road, located in South Tracy.